Wood Foundation Inspection Report
 
   

P.W.F. Quality Control Foundation Inspection Report

Each Foundation package which is certified as being in compliance with this Permanent Wood Foundation fabrication specification shall be produced under a quality control program, and each panel and other component parts in the package shall comply with this specification. A certification of inspection showing conformance to this specification and to approved shop drawing shall be issued by the fabricator and shall be sent in duplicate to the purchase of each foundation package.

An inspection shall be made on each foundation system certified as being in compliance with this specification, and a written report shall be prepared. The fabricator shall maintain a file copy of each inspection report for not less than two years.

The inspection report on each foundation system shall indicate that the inspectors has access to approved shop drawing for that job and shall include but not be limited to:


P.W.F. Foundation Inspection Report

Report used for Panelize Foundations
 

Owner(s) Name(s):

Address:

Phone Number:

Materials Supplier:

Contractor:

Designer of Foundation:

Site Address:

Date of Inspection:

______________________________________________

______________________________________________

______________________________________________

______________________________________________

______________________________________________

______________________________________________

______________________________________________

______________________________________________

Mark ( OK ) to certified each line item.

  1. Bearing Soil:
  2. Granular Drainage Layer:
  3. Sump Crock system:
  4. Footing Plates and Gravel:
  5. Window Framing and Nailing:
  6. Sub Walls and Frost depth:
  7. Shear Walls and Nailing:
  8. Post and Columns:
  9. Main Beams:
  10. Interior Bearing Walls:
  11. Floor System and Connections:
  12. End Wall Blocking:
  13. Floor Framing Anchor:
  14. Stairwell Opening:
  15. Basement Floor System:
  16. Exterior Moisture Barrier:
  17. Grade Board:
  18. Caulking at Plywood Seams:
  19. Knee-Walls:
  20. All Nail spacing and Nail types:
  21. Grade and Treatment Stamps:

 

____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________

 

 

I, ___________________________

hereby certify that the project listed above has pass the Permanent Wood Foundation Quality Control Check-List. Its is now ready for backfilling operations to take place.

 

___________________________
(Signature)

___________________________
(Date)

 

 